Switching to solar energy is more than just installing a few panels on your roof. It’s a journey that transforms not just your home but also the way you interact with energy. At Innovel Energy, we don’t just install solar panels—we ensure that every customer experiences a smooth, hassle-free, and future-ready transition to sustainable energy. Here’s an insider look at what happens behind the scenes during a solar panel installation and how our team makes it seamless.
Step 1: Site Assessment and Feasibility Check
Before we even talk about panels, the first step is understanding your space. Our trained technicians visit your property to assess key factors like:
- Sunlight Exposure: A shaded roof can reduce efficiency by up to 40%, so we check for any obstructions like trees, neighboring buildings, or water tanks.
- Roof Angle and Structure: The tilt and strength of your roof determine the efficiency of the solar system. We assess whether your roof can withstand the weight and determine the optimal placement for maximum sun exposure.
- Energy Consumption Analysis: We analyze your electricity bills and calculate your average monthly consumption. This helps us design a system that meets your energy needs, ensuring that your investment pays off quickly.
Data Insight: On average, roofs with optimal sunlight exposure can generate up to 5-6 kWh per kW installed daily!
Step 2: Design, Approvals, and Paperwork
Once the site assessment is complete, our engineers design a customized solar system tailored to your energy consumption and roof space. But there’s more to it than just technical diagrams—there’s a lot of paperwork involved, and we handle it all for you:
- Net Metering Application: This allows you to export excess electricity back to the grid and earn credits on your bill.
- Government Subsidies and Permits: Several government incentives and subsidies are available for solar installations today. Our knowledgeable team ensures that clients maximize their benefits by identifying the right schemes and handling the entire application process seamlessly.
Data Insight: Innovel Energy has successfully facilitated over 2 lakh solar installations, ensuring tha tour clients receive their subsidies as quickly as possible.
Step 3: Installation and System Integration
Our expert technicians get to work, ensuring that every panel, inverter, and wiring connection is done with precision. Here’s what happens during installation:
- Mounting and Panel Placement: We fix high-quality, durable mounting structures that hold the solar panels securely. The angle is adjusted to ensure maximum sun exposure throughout the day.
- Inverter and Electrical Connection: The inverter converts the direct current (DC) generated by the panels into alternating current (AC), which powers your home. We ensure the connection is flawless and integrated with your existing grid system.
- Safety and Quality Checks: Every installation goes through a rigorous quality check to ensure that safety standards are met, and performance is optimized.
Data Insight: The cost of solar power has dropped by over 90% since 2010, making it cheaper than coal and gas in most parts of the world
What Makes Innovel Different?
- Post-Installation Support: We don’t just walk away after installation. Our team provides regular maintenance, performance monitoring, and quick troubleshooting, ensuring your system runs smoothly for 25+ years.
- With 22+ years of expertise since 2002, Innovel (Formerly Bhaskar Solar) is one of the oldest and most trusted names in the industry—our longevity proves our commitment to quality, reliability, and lasting impact.
- Dedicated Customer Care: Whether it’s a minor glitch or a query about your bill, our support team is just a call away.
Data Insight: 100% of our clients report significant reductions in electricity bills within the first month of installation.





